forums
new posts
donate
UER Store
events
location db
db map
search
members
faq
terms of service
privacy policy
register
login




Location DB > England > Oxfordshire > Didcot > Didcot Power Stations > Didcot "B" > Generator

3 / 10   Generator

Description
This is one of the generators. I think the blue pipes are the three phases coming out... I'm sure someone far more clued up like Inventor or Turbozutek will come to my aid and correct me if needed!
Controls

Return to Main Location Page

Return to Gallery Overview

Edit this Gallery

Edit this Picture

Un-Subscribe this Picture
Comments
Posted by IIVQ 5/20/2008 5:24 PM | remove
  I suppose you're right. I think because the low voltages generators produce (usually something near 750 volts), there is so much current flow it can't be transported trough busbars. The blue pipes are probably filled with transformer oil - really nasty stuff
Posted by TurboZutek 7/8/2009 3:00 PM | remove
  Yah the darker part is the 3-phase right enough, these head off outside to the step up transformer.

Here's the colour coding:

http://www.turbozu...05/Three_Phase.jpg

;-)
If you'd like to add a comment, please login or register.



All content and images copyright © 2002-2024 UER.CA and respective creators. Graphical Design by Crossfire.
To contact webmaster, or click to email with problems or other questions about this site: UER CONTACT
View Terms of Service | View Privacy Policy | Server colocation provided by Beanfield
This page was generated for you in 375 milliseconds. Since June 23, 2002, a total of 741284226 pages have been generated.