forums
new posts
donate
UER Store
events
location db
db map
search
members
faq
terms of service
privacy policy
register
login




Location DB > United States > Illinois > East St. Louis > Armour Packing Plant > Mi Armour 2008-2012 > CRW_2445

19 / 25   CRW_2445

Description
Controls

Return to Main Location Page

Return to Gallery Overview

Edit this Gallery

Edit this Picture

Un-Subscribe this Picture
Comments
Posted by oh-ten 2/4/2013 3:04 AM | remove
  Trip 2: A beautiful November day in 2008.

This is the lower level of the two story causeway that connected the killing floor with the chutes to the pig pens. Note the secessional woodland germinating on the roof fifty feet above ground.
Posted by oh-ten 2/4/2013 3:05 AM | remove
  Trip 2: A hot July Saturday in 2009.

This is the lower level of the two story causeway that connected the killing floor with the chutes to the pig pens. Note the secessional woodland germinating on the roof fifty feet above ground.
If you'd like to add a comment, please login or register.



All content and images copyright © 2002-2024 UER.CA and respective creators. Graphical Design by Crossfire.
To contact webmaster, or click to email with problems or other questions about this site: UER CONTACT
View Terms of Service | View Privacy Policy | Server colocation provided by Beanfield
This page was generated for you in 351 milliseconds. Since June 23, 2002, a total of 738444011 pages have been generated.