|
|
|
UER Store
|
|
sweet UER decals:
|
|
|
The ugly tug. Pipes and ducts on the roof were part of the water pumping system. I think these ships operated as a pair. The General Brock was the drill platform, the other one pumped the site clear. Later in this series of pictures are round floatie things used to hold drill extenstions which were towed out to the site and attached as needed.
|
|
|
|
|
All content and images copyright © 2002-2024 UER.CA and respective creators. Graphical Design by Crossfire.
To contact webmaster, or click to email with problems or other questions about this site:
UER CONTACT
View Terms of Service |
View Privacy Policy |
Server colocation provided by Beanfield
This page was generated for you in 437 milliseconds. Since June 23, 2002, a total of 739146016 pages have been generated.
|
|