Section 7a Construction entry by toxictoaster 8/26/2005 11:38 PM
| Over the last week and a half section 7a of the tunnels has been under construction. The construction has left the tunnel completely open, the sides, and roof have come off. This makes entrance to the tunnels via the south entrance risky, being you would have to walk through the area that is under construction.
Here is a pic of the tunnels under construction.
Modify Entry |
|
Comments: (use Reply to add a comment)
Add a poll to this thread
This thread is one of your Favourites. Click to make normal.Click to make this thread a Favourite.
This thread is in a public category, and can't be made private. |