|
|
|
UER Store
|
|
sweet UER decals:
|
|
|
|
Activity
|
|
751 online
Server Time:
2024-05-08 22:56:04
|
|
|
This machinery was in the hall which was on the head end of halls 1-4. I don't have a clue what this thing did, but my guess is something with air supply. This structure was, together with a control hut, the only standing structure within the halls. Estimated size: 10-15 m (high!, and much longer)
|
|
|
Posted by IIVQ |
2/4/2008 9:23 PM | remove |
Actually, this is a sheet metal working machine (however, I don't know exactly how or what)
|
If you'd like to add a comment, please login or register.
|
|
|
|
All content and images copyright © 2002-2024 UER.CA and respective creators. Graphical Design by Crossfire.
To contact webmaster, or click to email with problems or other questions about this site:
UER CONTACT
View Terms of Service |
View Privacy Policy |
Server colocation provided by Beanfield
This page was generated for you in 398 milliseconds. Since June 23, 2002, a total of 741074289 pages have been generated.
|
|