|
|
|
UER Store
|
|
sweet UER decals:
|
|
|
|
Activity
|
|
647 online
Server Time:
2024-05-13 11:31:38
|
|
|
Caption: A 5-TONS GRAB operated by an electric transporter crane picks up five tons of coal at a time to load on to the conveyer belt which leads to the bunkers of Battersea Power Station. The coal used is small coal, or slack, specially selected because of its low sulphur content. The grab is taking coal from the reserve store of about 70,000 tons, enough to run the station for two months at normal load. Underneath these hills of coal is the intricate system of intakes which supply water from the Thames for the boilers.
|
|
|
|
|
All content and images copyright © 2002-2024 UER.CA and respective creators. Graphical Design by Crossfire.
To contact webmaster, or click to email with problems or other questions about this site:
UER CONTACT
View Terms of Service |
View Privacy Policy |
Server colocation provided by Beanfield
This page was generated for you in 593 milliseconds. Since June 23, 2002, a total of 741558237 pages have been generated.
|
|