Infiltration
THEORY
Ethics
Observations
 
PRACTICE
Abandoned Sites
Boats
Churches
Drains/Catacombs
Hotels/Hospitals
Transit Tunnels
Utility Tunnels
Various
 
RESOURCES
Exploration Timeline
Infilnews
Infilspeak Dictionary
Usufruct Blog
Worldwide Links
Infiltration Forums home | search | login | register

Reply
Infiltration Forums > Journal Index > Stories from the Fredericton Underground > Section 7a Construction(Viewed 2603 times)
Section 7a Construction
entry by toxictoaster 
8/26/2005 11:38 PM

Over the last week and a half section 7a of the tunnels has been under construction. The construction has left the tunnel completely open, the sides, and roof have come off. This makes entrance to the tunnels via the south entrance risky, being you would have to walk through the area that is under construction.


Here is a pic of the tunnels under construction.


41571.jpg (91 kb, 691x452)
click to view




Modify Entry



Comments: (use Reply to add a comment)
Infiltration Forums > Journal Index > Stories from the Fredericton Underground > Section 7a Construction(Viewed 2603 times)
Reply

Add a poll to this thread



This thread is in a public category, and can't be made private.

Powered by AvBoard AvBoard version 1.5 alpha
Page Generated In: 62 ms