|
|
|
UER Store
|
|
order your copy of Access All Areas today!
|
|
|
|
Activity
|
|
781 online
Server Time:
2024-04-20 02:19:02
|
|
|
| Section 7a Construction entry by toxictoaster 8/26/2005 11:38 PM
| Over the last week and a half section 7a of the tunnels has been under construction. The construction has left the tunnel completely open, the sides, and roof have come off. This makes entrance to the tunnels via the south entrance risky, being you would have to walk through the area that is under construction.
Here is a pic of the tunnels under construction.
Modify Entry |
|
Comments: (use Reply to add a comment)
This thread is in a public category, and can't be made private. |
|
All content and images copyright © 2002-2024 UER.CA and respective creators. Graphical Design by Crossfire.
To contact webmaster, or click to email with problems or other questions about this site:
UER CONTACT
View Terms of Service |
View Privacy Policy |
Server colocation provided by Beanfield
This page was generated for you in 125 milliseconds. Since June 23, 2002, a total of 738559409 pages have been generated.
|
|